Gateway to the pristine islands of Andaman & Nicobar. Veer Savarkar International Airport, Port Blair is soon going to have a new terminal building. The airport currently handles 18 lakhs passengers annually, considering the surge in the passenger traffic, Airports Authority of India has undertaken the work for Construction of New Integrated Terminal Building at the
cost of Rs. 700 Crores. With total built up area of 40,837 sqm, the New Terminal Building will be capable to handle 1200 passengers during peak hours and about 50 lakhs passengers annually. The new passenger terminal building will have three-levels comprising of lower ground, upper ground and first floor. The lower ground floor will be used as remote arrival, departure and service area, the upper ground floor will have entry gate for departure passengers and exit gate for arrival passengers and the first floor as awaiting lounge for international passengers.